Difference between revisions of "Project ACKspace 3.5"
(big update on the new space condition) |
|||
Line 12: | Line 12: | ||
=== synopsis === | === synopsis === | ||
− | |||
{{InfoBox | {{InfoBox | ||
|Type=alert | |Type=alert | ||
− | |Title= | + | |Title=Featured |
− | |Text=We | + | |Text=We have moved!<br/> |
− | + | We're on the 4th floor now (exiting core Z's elevator, go right, take the automatic door (east south-east), at the end of section L go to door L407. (L406, L409 and L412 is also part of ACKspace)<br/> | |
− | |Float= | + | L4 (and K4) has been made 24/7 accessible, keys are still temporarily (officially managed by Prodigity), located in Q312, Q313, Q316 and Q317 |
+ | |Float=none | ||
|Background=#f7f7f7 | |Background=#f7f7f7 | ||
}} | }} | ||
− | + | Most of the stuff has been moved, but there still is a lot to be done. Here are some first pictures of the <sub>H</sub>ACKspace | |
<gallery> | <gallery> | ||
Line 30: | Line 30: | ||
=== todo === | === todo === | ||
− | * | + | * move the cola machine (use work boots!!) |
− | * | + | * move the last bits inside the cabinets (and other snippets) |
+ | * clean the Q3 rooms | ||
+ | * verify the new internet connection is working (Z-1-L04-08A) | ||
+ | * order all the (L4) cabinets so they make sense and all tools are easy to grab | ||
=== Preliminary floorplan ACKspace 3.5 === | === Preliminary floorplan ACKspace 3.5 === |
Revision as of 17:00, 30 December 2014
Attention:
You are looking at an event that took place in the past
Event: Project ACKspace 3.5 | |
---|---|
Featured: | |
State: | Active |
Start date: | 2014/11/28 |
Start time: | 16:00 |
End date: | 2014/12/31 |
End time: | 23:00 |
Contact: | Prodigity |
Kind: | |
Location: | ACKspace 4th floor, rooms L406, L407, L409 and L412 |
URL: | |
Fee: | |
Short description: | Help ACKspace put their stuff at the new 3.5 space |
synopsis
Featured
We have moved!
We're on the 4th floor now (exiting core Z's elevator, go right, take the automatic door (east south-east), at the end of section L go to door L407. (L406, L409 and L412 is also part of ACKspace)
Most of the stuff has been moved, but there still is a lot to be done. Here are some first pictures of the HACKspace
todo
- move the cola machine (use work boots!!)
- move the last bits inside the cabinets (and other snippets)
- clean the Q3 rooms
- verify the new internet connection is working (Z-1-L04-08A)
- order all the (L4) cabinets so they make sense and all tools are easy to grab
Preliminary floorplan ACKspace 3.5
This is the preliminary floorplan of our new space. If you have any comments or improvements, please share!