Difference between revisions of "Project ACKspace 3.5"
(added pictures) |
m (todo weggehaald) |
||
(11 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
{{Event | {{Event | ||
− | |State= | + | |State=Completed |
|Start date=2014/11/28 | |Start date=2014/11/28 | ||
|Start time=16:00 | |Start time=16:00 | ||
Line 6: | Line 6: | ||
|End time=23:00 | |End time=23:00 | ||
|Contact=Prodigity | |Contact=Prodigity | ||
− | |Location=ACKspace | + | |Location=Location::ACKspace |
|Short description=Help ACKspace put their stuff at the new 3.5 space | |Short description=Help ACKspace put their stuff at the new 3.5 space | ||
+ | }} | ||
+ | === synopsis === | ||
+ | {{InfoBox | ||
+ | |Type=featured | ||
+ | |Title=Note | ||
+ | |Text=We have moved!<br/> | ||
+ | We're on the 4th floor now (exiting core Z's elevator, go right, take the automatic door (east south-east), at the end of section L go to door L406. (L407, L409 and L412 is also part of ACKspace)<br/> | ||
+ | L4 (and K4) has been made 24/7 accessible. | ||
+ | |Float=none | ||
+ | |Background=#f7f7f7 | ||
}} | }} | ||
+ | |||
+ | Most of the stuff has been moved, but there still is a lot to be done. Here are some first pictures of the <sub>H</sub>ACKspace | ||
<gallery> | <gallery> | ||
Image:wallless.jpg|wallless | Image:wallless.jpg|wallless | ||
Image:wallless-closeup.jpg|wallless closeup | Image:wallless-closeup.jpg|wallless closeup | ||
+ | </gallery> | ||
+ | |||
+ | === Preliminary floorplan ACKspace 3.5 === | ||
+ | |||
+ | This is the preliminary floorplan of our new space. If you have any comments or improvements, please share! | ||
+ | |||
+ | <gallery> | ||
+ | Image:floorplan ackspace 3.5.png|Floor plan | ||
+ | Image:Ackspace3.5 1.jpg|<sub>H</sub>ACKspace | ||
+ | Image:Ackspace3.5 2.jpg|<sub>SL</sub>ACKspace | ||
</gallery> | </gallery> |
Latest revision as of 13:29, 19 July 2017
Attention:
You are looking at an event that took place in the past
Event: Project ACKspace 3.5 | |
---|---|
Featured: | |
State: | Completed |
Start date: | 2014/11/28 |
Start time: | 16:00 |
End date: | 2014/12/31 |
End time: | 23:00 |
Contact: | Prodigity |
Kind: | |
Location: | Location::ACKspace |
URL: | |
Fee: | |
Short description: | Help ACKspace put their stuff at the new 3.5 space |
synopsis
Note
We have moved!
We're on the 4th floor now (exiting core Z's elevator, go right, take the automatic door (east south-east), at the end of section L go to door L406. (L407, L409 and L412 is also part of ACKspace)
Most of the stuff has been moved, but there still is a lot to be done. Here are some first pictures of the HACKspace
Preliminary floorplan ACKspace 3.5
This is the preliminary floorplan of our new space. If you have any comments or improvements, please share!