Difference between revisions of "Project ACKspace 3.5"

From Hackerspace ACKspace
Jump to: navigation, search
(big update on the new space condition)
Line 12: Line 12:
  
 
=== synopsis ===
 
=== synopsis ===
Soon we're moving internally from Q312, Q313, Q316 and Q317 (on the third floor, section Q) to L406, L407, L409 and L412 (on the fourth floor, section L). The contract addendum needs to be signed, followed by the official handover.
 
 
{{InfoBox
 
{{InfoBox
 
|Type=alert
 
|Type=alert
|Title=Warning
+
|Title=Featured
|Text=We do not have official access to the new rooms yet. When we have, this wiki will be updated accordingly<br/>
+
|Text=We have moved!<br/>
Also, The L-section is not part of the 24/7-access wing. Access outside office hours is therefore prohibited.
+
We're on the 4th floor now (exiting core Z's elevator, go right, take the automatic door (east south-east), at the end of section L go to door L407. (L406, L409 and L412 is also part of ACKspace)<br/>
|Float=right
+
L4 (and K4) has been made 24/7 accessible, keys are still temporarily (officially managed by Prodigity), located in Q312, Q313, Q316 and Q317
 +
|Float=none
 
|Background=#f7f7f7
 
|Background=#f7f7f7
 
}}
 
}}
  
Recently, the brick wall has been removed for us, which needs some small finishes. Here are some first pictures of the <sub>H</sub>ACKspace
+
Most of the stuff has been moved, but there still is a lot to be done. Here are some first pictures of the <sub>H</sub>ACKspace
  
 
<gallery>
 
<gallery>
Line 30: Line 30:
  
 
=== todo ===
 
=== todo ===
* Look at, and implement [[User:Danny_Witberg|Danny_W]]'s layout
+
* move the cola machine (use work boots!!)
* check and see if the <sub>SL</sub>ACKspace needs laminate flooring
+
* move the last bits inside the cabinets (and other snippets)
 +
* clean the Q3 rooms
 +
* verify the new internet connection is working (Z-1-L04-08A)
 +
* order all the (L4) cabinets so they make sense and all tools are easy to grab
  
 
=== Preliminary floorplan ACKspace 3.5 ===
 
=== Preliminary floorplan ACKspace 3.5 ===

Revision as of 18:00, 30 December 2014

Attention:
You are looking at an event that took place in the past
Event: Project ACKspace 3.5
Featured:
State: Active
Start date: 2014/11/28
Start time: 16:00
End date: 2014/12/31
End time: 23:00
Contact: Prodigity
Kind:
Location: ACKspace 4th floor, rooms L406, L407, L409 and L412
URL:
Fee:
Short description: Help ACKspace put their stuff at the new 3.5 space


synopsis

Featured
We have moved!

We're on the 4th floor now (exiting core Z's elevator, go right, take the automatic door (east south-east), at the end of section L go to door L407. (L406, L409 and L412 is also part of ACKspace)

L4 (and K4) has been made 24/7 accessible, keys are still temporarily (officially managed by Prodigity), located in Q312, Q313, Q316 and Q317

Most of the stuff has been moved, but there still is a lot to be done. Here are some first pictures of the HACKspace

todo

  • move the cola machine (use work boots!!)
  • move the last bits inside the cabinets (and other snippets)
  • clean the Q3 rooms
  • verify the new internet connection is working (Z-1-L04-08A)
  • order all the (L4) cabinets so they make sense and all tools are easy to grab

Preliminary floorplan ACKspace 3.5

This is the preliminary floorplan of our new space. If you have any comments or improvements, please share!

Floorplan ackspace 3.5.png