Difference between revisions of "Project ACKspace 3.5"

From Hackerspace ACKspace
Jump to: navigation, search
(updated (verified) room numbers, added status and warning, added todo)
m (todo weggehaald)
 
(10 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 
{{Event
 
{{Event
|State=Active
+
|State=Completed
 
|Start date=2014/11/28
 
|Start date=2014/11/28
 
|Start time=16:00
 
|Start time=16:00
Line 6: Line 6:
 
|End time=23:00
 
|End time=23:00
 
|Contact=Prodigity
 
|Contact=Prodigity
|Location=ACKspace 4th floor, rooms L406, L407, L409 and L412
+
|Location=Location::ACKspace
 
|Short description=Help ACKspace put their stuff at the new 3.5 space
 
|Short description=Help ACKspace put their stuff at the new 3.5 space
 
}}
 
}}
 
 
 
=== synopsis ===
 
=== synopsis ===
Soon we're moving internally from Q312, Q313, Q316 and Q317 (on the third floor, section Q) to L406, L407, L409 and L412 (on the fourth floor, section L). The contract addendum needs to be signed, followed by the official handover.
 
 
{{InfoBox
 
{{InfoBox
|Type=alert
+
|Type=featured
|Title=Warning
+
|Title=Note
|Text=We do not have official access to the new rooms yet. When we have, this wiki will be updated accordingly<br/>
+
|Text=We have moved!<br/>
Also, The L-section is not part of the 24/7-access wing. Access outside office hours is therefore prohibited.
+
We're on the 4th floor now (exiting core Z's elevator, go right, take the automatic door (east south-east), at the end of section L go to door L406. (L407, L409 and L412 is also part of ACKspace)<br/>
|Float=right
+
L4 (and K4) has been made 24/7 accessible.
 +
|Float=none
 
|Background=#f7f7f7
 
|Background=#f7f7f7
 
}}
 
}}
  
Recently, the brick wall has been removed for us, which needs some small finishes. Here are some first pictures of the <sub>H</sub>ACKspace
+
Most of the stuff has been moved, but there still is a lot to be done. Here are some first pictures of the <sub>H</sub>ACKspace
  
 
<gallery>
 
<gallery>
Line 29: Line 27:
 
</gallery>
 
</gallery>
  
=== todo ===
+
=== Preliminary floorplan ACKspace 3.5 ===
* Look at, and implement [[User:Danny_Witberg|Danny_W]]'s layout
+
 
* check and see if the <sub>SL</sub>ACKspace needs laminate flooring
+
This is the preliminary floorplan of our new space. If you have any comments or improvements, please share!
 +
 
 +
<gallery>
 +
Image:floorplan ackspace 3.5.png|Floor plan
 +
Image:Ackspace3.5 1.jpg|<sub>H</sub>ACKspace
 +
Image:Ackspace3.5 2.jpg|<sub>SL</sub>ACKspace
 +
</gallery>

Latest revision as of 14:29, 19 July 2017

Attention:
You are looking at an event that took place in the past
Event: Project ACKspace 3.5
Featured:
State: Completed
Start date: 2014/11/28
Start time: 16:00
End date: 2014/12/31
End time: 23:00
Contact: Prodigity
Kind:
Location: Location::ACKspace
URL:
Fee:
Short description: Help ACKspace put their stuff at the new 3.5 space

synopsis

Note
We have moved!

We're on the 4th floor now (exiting core Z's elevator, go right, take the automatic door (east south-east), at the end of section L go to door L406. (L407, L409 and L412 is also part of ACKspace)

L4 (and K4) has been made 24/7 accessible.

Most of the stuff has been moved, but there still is a lot to be done. Here are some first pictures of the HACKspace

Preliminary floorplan ACKspace 3.5

This is the preliminary floorplan of our new space. If you have any comments or improvements, please share!