Difference between revisions of "Project ACKspace 3.5"

From Hackerspace ACKspace
Jump to: navigation, search
(todo)
m (todo weggehaald)
 
(2 intermediate revisions by the same user not shown)
Line 6: Line 6:
 
|End time=23:00
 
|End time=23:00
 
|Contact=Prodigity
 
|Contact=Prodigity
|Location=ACKspace 4th floor, rooms L406, L407, L409 and L412
+
|Location=Location::ACKspace
 
|Short description=Help ACKspace put their stuff at the new 3.5 space
 
|Short description=Help ACKspace put their stuff at the new 3.5 space
 
}}
 
}}
Line 16: Line 16:
 
We're on the 4th floor now (exiting core Z's elevator, go right, take the automatic door (east south-east), at the end of section L go to door L406. (L407, L409 and L412 is also part of ACKspace)<br/>
 
We're on the 4th floor now (exiting core Z's elevator, go right, take the automatic door (east south-east), at the end of section L go to door L406. (L407, L409 and L412 is also part of ACKspace)<br/>
 
L4 (and K4) has been made 24/7 accessible.
 
L4 (and K4) has been made 24/7 accessible.
The old space is accessible (via the old lounge using the separate key with the brass label on it).
 
 
|Float=none
 
|Float=none
 
|Background=#f7f7f7
 
|Background=#f7f7f7
Line 27: Line 26:
 
Image:wallless-closeup.jpg|wallless closeup
 
Image:wallless-closeup.jpg|wallless closeup
 
</gallery>
 
</gallery>
 
=== todo ===
 
* <s>move the cola machine (use work boots!!)</s>
 
* <s>move the last bits inside the cabinets (and other snippets)</s>
 
* <s>clean the Q3 rooms</s>
 
* <s>verify the new internet connection is working (Z-1-L04-08A)</s>
 
* order all the (L4) cabinets so they make sense and all tools are easy to grab
 
* Keep the current space clean and clutter-free
 
  
 
=== Preliminary floorplan ACKspace 3.5 ===
 
=== Preliminary floorplan ACKspace 3.5 ===
Line 40: Line 31:
 
This is the preliminary floorplan of our new space. If you have any comments or improvements, please share!
 
This is the preliminary floorplan of our new space. If you have any comments or improvements, please share!
  
[[File:floorplan ackspace 3.5.png]]
+
<gallery>
 
+
Image:floorplan ackspace 3.5.png|Floor plan
[[File:ackspace3.5_1.jpg]]<br>
+
Image:Ackspace3.5 1.jpg|<sub>H</sub>ACKspace
[[File:ackspace3.5_2.jpg]]
+
Image:Ackspace3.5 2.jpg|<sub>SL</sub>ACKspace
 +
</gallery>

Latest revision as of 14:29, 19 July 2017

Attention:
You are looking at an event that took place in the past
Event: Project ACKspace 3.5
Featured:
State: Completed
Start date: 2014/11/28
Start time: 16:00
End date: 2014/12/31
End time: 23:00
Contact: Prodigity
Kind:
Location: Location::ACKspace
URL:
Fee:
Short description: Help ACKspace put their stuff at the new 3.5 space

synopsis

Note
We have moved!

We're on the 4th floor now (exiting core Z's elevator, go right, take the automatic door (east south-east), at the end of section L go to door L406. (L407, L409 and L412 is also part of ACKspace)

L4 (and K4) has been made 24/7 accessible.

Most of the stuff has been moved, but there still is a lot to be done. Here are some first pictures of the HACKspace

Preliminary floorplan ACKspace 3.5

This is the preliminary floorplan of our new space. If you have any comments or improvements, please share!